PennDOT is continuing resurfacing operations next week on state highways in Bucks County under several ongoing contracts to repair, resurface, and improve miles of state highways county wide.
Motorists are advised of the following travel restrictions:
Bucks County
- Monday, April 20, through Friday, April 24, from 9 a.m. to 3 p.m. and 7 p.m. to 5 a.m., the following morning, a lane closure with flagging will be in place on Bristol Oxford Valley Road/Bath Road between U.S. 13 (Bristol Pike) and Business U.S. 30 (Lincoln Highway) in Bristol Borough and Bristol, Middletown, and Falls townships for milling, paving, and utility adjustments.
- Monday, April 20, through Friday, April 24, from from 9 a.m. to 3 p.m. and 7 p.m. to 5 a.m., to 5:00 AM the following morning, a lane closure with flagging will be in place on Oxford Valley Road between Big Oak Road and Stoney Hill Road in Lower Makefield Township for milling, paving, and utility adjustments.
- Monday, April 20, through Friday, April 24, from from 9 a.m. to 3 p.m. and 6 p.m. to 6 a.m., the following morning, a lane closure with flagging will be in place on Comly Avenue/Highland Avenue between Route 413 (Bellevue Avenue) and U.S. 1 (Lincoln Highway) in Langhorne Manor Borough and Middletown Township for milling, paving, and utility adjustments.
Drivers are advised to allow extra time when traveling through the work areas because backups and delays will occur. All scheduled activities are weather dependent.

Credit: Joanne Ames – Lower Bucks Source
Click to comment


Recent Comments