Connect with us
Flager & Associates , PC
lower bucks hospital

State/County - Bensalem Township

Night Construction Scheduled in Bensalem & Middletown Twps on U.S. 1 & Rockhill Drive

Published

on

PennDOT announced construction is scheduled starting Monday on U.S. 1 and Rockhill Drive in Bensalem and Middletown townships.

Motorists are advised of the following travel restrictions:

Motorists are advised to allow extra time when traveling through the work areas because backups and delays will occur. All scheduled activities are weather dependent.

Continue Reading
Advertisement
Flager & Associates , PC
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Human Interest - Bensalem Township

Police Seek Info on Missing Teen Believed to be in Lower Bucks Area

Published

on

Police from Plumstead Township Police Department with an assist from Tullytown  Borough Police  are asking for help from the community in attempting to locate a missing  17 year-old .

Ryan  Jaatar Age 17 is  5ft 8in Brown eyes and has not been seen since January 3, 2026, police say.

Jaatar was last seen by his father at their residence in Plumstead Township.

Jaatar’s, according to investigators,  is believed to be in the Levittown/Bristol/Croydon area.

Anyone with information, please contact Detective Stacie Arnosky at sarnosky@plumstead.gov or 215-766-8741, ext. 120 or Contact the Tullytown Borough Police Department at 215-945-0999. You can also submit a confidential tip at through this link.

Continue Reading

State/County - Bensalem Township

Burlington Bristol Bridge to Close Overnight Beginning Friday for Maintenance Work

Published

on

By

The Burlington County Bridge Commission announced that the Burlington Bristol Bridge will be closed to all vehicle traffic from 9 p.m. to 5 a.m. overnight beginning tomorrow (Friday March 6,) to Tuesday, March 10, weather permitting, for maintenance and repair work.

Continue Reading

Human Interest - Bensalem Township

Floral Design Program Wins Again at Philadelphia Flower Show

Published

on

By

Dr. Patrick M. Jones (left), President & CEO of Bucks County Community College, and Carol Tyler admire the College’s floral design program’s exhibit at the Philadelphia Flower Show featuring “Joan of Arc at Orleans” by Stella Elkins Tyler. The sculpture, donated to the College by the Tyler family, is the centerpiece of the College’s award-winning “Rooted in Art” exhibit. The College was founded on the Tyler estate in Newtown more than 60 years ago. Credit: BCCC

In only its second year, Bucks County Community College (BCCC) picked up another medal at the prestigious horticultural expo for its ‘Rooted in Art’ tribute to Stella Elkins Tyler.

BCCC’s floral design program has once again taken home a prize in only its second year participating in the Philadelphia Flower Show. Students, alumni, and instructors earned a bronze medal for “Rooted in Art,” reflecting the College’s origins of being founded on the Newtown estate of artist and educational philanthropist Stella Elkins Tyler. The exhibit features Tyler’s sculpture “Joan of Arc at Orleans,” donated to the College by Carol Tyler, who visited the show with College President & CEO Dr. Patrick M. Jones (Feature Pic).  The College was founded on the Tyler estate in Newtown more than 60 years ago. The exhibit features seven original floral designs, each interpreting the connection between nature, art, and education, alongside six selected student works from the College’s School of Arts and Communication.

Credit: BCCC

A team of 20 students, alumni, and instructors from BCCC’s floral design program helped install “Rooted in Art” at the Philadelphia Flower Show, which reflects the College’s origins of being founded on the Newtown estate of artist and educational philanthropist Stella Elkins Tyler. The exhibit features one of Tyler’s original bronze sculptures, “Joan of Arc at Orleans,” pictured in the background.

Credit: BCCC

Melanie Poff (left) and her mother Els Poff, both Certified Floral Designers from Doylestown and students in BCCC’s floral design program, helped surround “Joan of Arc at Orleans” by Stella Elkins Tyler with botanical beauty at the Philadelphia Flower Show. The sculpture is part of the “Rooted in Art” exhibit, reflecting the deep connection between art, education, and nature that Stella Elkins Tyler championed throughout her life.

Credit: BCCC

Amparito Arriaga, a Certified Floral Designer from Exton and a student in BCCC’s floral design program, installs part of the “Rooted in Art” exhibit at the Philadelphia Flower Show. The exhibit features seven original floral designs, each interpreting the connection between nature, art, and education, alongside six selected student works from the College’s School of Arts and Communication.

Continue Reading

SUBSCRIBE TO NEWSLETTER

Subscribe to our newsletter today to receive a daily email digest of our recent stories.

Categories

Trending